The Borneo Post. (20 March 2024). Two tube wells at UMS to begin supplying water March 26. [Utusan Borneo]. [Newspaper].
Text
Two tube wells at UMS to begin supplying water March 26 - UB 20.03.2024 P.05.pdf Download (452kB) |
CATEGORY OF RECORD: | Newspaper |
---|---|
Depositing User: | ZAITUN BINTI MARJAN - |
Date Deposited: | 17 Jul 2024 01:48 |
Last Modified: | 17 Jul 2024 01:48 |
URI: | https://arkib.ums.edu.my/id/eprint/15215 |
Actions (login required)
View Item |